Tiger pile method - List of Manufacturers, Suppliers, Companies and Products | IPROS

Tiger pile method Product List

1~3 item / All 3 items

Displayed results

Ground reinforcement work | The necessity of protecting buildings with public performance certification and advanced quality control systems.

The necessity of ground reinforcement work through the acquisition of public performance certification and strict quality control. High reliability in foundation quality is achieved through tracking records of all pouring data.

In ground reinforcement work, ensuring objective technical evidence and strict construction quality management is a fundamental element in securing the safety and reliability of structures. If poor construction occurs due to insufficient ground evaluation or management, it can lead to differential settlement, directly impacting the trust of the client and designer. The Tiger Pile Method is a reliable ground reinforcement technology that has obtained GBR-C performance certification (No. 06-12 Rev. 4) from the General Incorporated Foundation Japan Building Disaster Prevention Association. A formula for allowable bearing capacity has been established based on numerous actual column load test data, promising high-quality construction that thoroughly eliminates variations in strength through the composite effect of soil-cement columns and stepped steel pipes. GeoTech Co., Ltd. monitors and records rotational torque and penetration depth in real-time using specialized equipment based on the ISO 9001 certified Quality Management System (QMS). We ensure traceability by electronically storing construction data and provide reliable foundation reinforcement work with a comprehensive warranty system.

  • Residential foundations
  • Renovation and repair methods
  • Other civil engineering works
  • Tiger pile method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Data Center Ground Reinforcement: Tiger Pile Method

Achieving high support capacity and a short construction period. Optimized foundation with Tiger Piles ensuring seismic resistance for DC.

In the construction of data centers that support large-capacity servers, ground stability and adherence to schedules are essential. Unaddressed soft ground can lead to differential settlement and reduced seismic resistance. The Tiger Pile method, which combines soil-cement columns and high-strength stepped steel pipes, maximizes vertical load-bearing capacity per pile. It optimizes construction time and costs while maintaining high seismic resistance and reliability. 【Usage Scenarios】 - Addressing soft ground during new data center construction - Building high-load foundations - Projects that prioritize construction time - Sites where soil disposal needs to be minimized 【Implementation Effects】 - High load-bearing capacity secured by steel pipe core materials - Cost reduction through shortened construction time - Reduced soil disposal costs - Quality stability through monitoring

  • others
  • Tiger pile method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tiger Pile Method | Ground Reinforcement for Factory Plants [Geotech]

Efficient ground reinforcement for heavy objects. A hybrid technology that achieves shortened construction periods and cost reduction.

The Tiger Pile Method is a hybrid technology that streamlines ground reinforcement for heavy loads, achieving shortened construction periods and cost reductions. In the construction of factory plants or during equipment expansions, inappropriate method selection on soft ground can lead to equipment troubles due to uneven settlement, as well as delays in construction schedules and increased disposal costs from excessive construction lengths, putting pressure on budgets. This method combines soil cement columns with high-strength stepped steel pipes to exhibit high vertical load-bearing capacity. 【Application Scenarios】 - Foundation reinforcement during the installation of heavy equipment in factory plants - Ground improvement with a short construction period on soft ground - Projects that prioritize the reduction of construction waste generation 【Benefits of Implementation】 - Reduction in the number of pouring locations and construction length due to improved load-bearing capacity per improved body - Compression of disposal and transportation costs due to reduced waste generation - Increased project profitability due to shortened construction periods

  • others
  • Tiger pile method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration